ECI Job # 212


This project was Awarded Nov 12, 2001 and completed July 24, 2003

Contract Amount        $8,259,494

Contract # DACA41-01-C-0004

 

 
 

This project is complete, please contact our home office for more information

    Kansas City, MO, USA

ECI Construction Inc.

North America Headquarters
7270 W 162nd Street
Shawnee Mission, KS 66085
USA

Tel: 913.681.2323
Fax: 913.681.
3970
E-mail: info@ECIcon.com

 

    KC-135 Squadron Operation Aircraft Maintenance Unit #4

 McConnell AFB, KS

 

44,000 sq. ft. building housing Administrative areas, classrooms, multi-tiered briefing room, maintenance areas, storage areas, operation areas and interior – cast in place – concrete storm shelter. Contract design demanded a high quality and high level of interior finishes.
The building itself consisted of heavy concrete foundation, structural steel framing, metal stud framing, extensive drywall finishes including arched corridors, extensive ceramic tile work, custom millwork, custom casework, bathrooms, locker rooms, carpeting, resilient flooring, exposed sealed interior concrete, PA system, fire alarm system, fire protection system, and a sophisticated DDC controlled HVAC system. Two story building housed multiple mechanical, electrical, communication and flammable storage areas. Building exterior consisted of brick veneers, exterior insulated finish system areas (EIFS), aluminum windows and standing seam metal roof system (SSMRS). Site work included extensive underground utilities, 75,000 sq. ft. asphalt pavements, 23,000 sq. ft. concrete pavements, 14,000 sq. ft. concrete sidewalks, extensive landscaping, sodding and full underground sprinkler system.

    KC-135 Squadron Operation Aircraft Maintenance Unit #4

McConnell AFB, KS