This project
provides for an 8500 SF masonry and steel frame structure
for a three bay Maintenance Facility with Administrative
Areas, parts Storage, Tool Storage, Break Area, Weapons
Vault, Locker Rooms, Mechanical Systems, HVAC Systems,
Electrical Systems, Security Systems, and Overhead Crane.
Also provides alteration of Pre-Engineered Metal Building
for unit/ individual supply operation and needed storage for
soldiers to store individual and mission equipment required
for training and mobilization. Large Military Equipment
Parking Lot, Small Vehicle Parking Lot, Anti-Terrorism /
Force Protection, site improvements, fencing, roadways and
utilities are included