ECI Job # 242


This  project was Awarded December 20, 2004

Contract Amount        $19,700,000

Please contact ECI Home Office regarding this project as it is complete.

North America Headquarters
7270 W 162nd Street
Shawnee Mission, KS 66085
USA

Tel: 913.681.2323
Fax: 913.681.3970
E-mail: info@ECIcon.com



 

FY05 F/A-22 Technical Training Facility

  Sheppard AFB, TX
 

ECI Construction Inc. constructed a new F-22 Technical Training Facility at Sheppard Air Force Base, Texas. The facility will contain high-bay training space, classroom, lab/shop, and all necessary support space. The facility will relocate existing communication training and reroute existing communication cable. Special considerations include ventilation to exhaust carbon monoxide gases, 400-hertz power required for training equipment, special secured rooms for sensitive information, and structural floors that support large dead loads (up to 25,000 lbs). Connect to base wide energy monitoring control system (EMCS). Supporting facilities include utilities; electric service; exterior and security lighting; fire protection and alarm systems; paving, walks, curbs and guttering; parking; extend roadway; oil and water separator; security fencing and gates; information systems; and site improvements.

 

    FY05 F/A-22 Technical Training Facility, Sheppard AFB, TX