Construction of a state-of-the-art air
traffic control tower consisting of 12 working levels, to
include; control cab level, catwalk level, mechanical level,
ready room level, upper equipment level, lower equipment
level, PAR level, briefing/locker level, chief controller
level, training office level, front load training level and
entry level consisting of Lobby, Vestibule, Communications,
Electrical, UPS, Mechanical and Storage rooms. Second level
training area will have a specialized simulator training
area within. Facility is 123-feet high and has a working
area of approximately 8,245 NSF.